< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=696062565948397&ev=PageView&noscript=1" />

Seeking Franchise Partners:Turn local demand into lasting returns with AFT

Knowledge

Excavator Undercarriages Information
  • How Do You Match Front Idlers for Mid-Size Dozers?

    Front idlers for mid-size dozers are matched by machine class, model generation, part number, and serial number, with heavier duty requirements than excavator idlers of similar size. Dozing loads the...

  • Is Rebuilding a Front Idler Worth It?

    Rebuilding a front idler is worth it when the idler core is within specification, the machine is worth keeping, and the rebuild cost stays well below a new idler. Compare...

  • Why Does My Excavator Throw Its Track?

    An excavator throws its track when the track line is wrong: idler misalignment, worn rollers, loose tension, or a worn sprocket. The front idler is the first place to check,...

  • How Do You Replace a Front Idler?

    Replace a front idler by securing the machine, releasing track tension, removing the idler and yoke assembly, inspecting the yoke and bushings, fitting the new idler, and aligning the track...

  • Forged or Cast Idlers: Which Lasts Longer?

    Forging and casting are two manufacturing routes, and neither alone guarantees longer life; the part number, material specification, heat treatment or hardness range, and intended duty decide how long an...

  • How Do You Measure Front Idler Wear?

    Measure front idler wear by checking flange height and diameter against the limits for your machine class. Wear limits exist because a worn idler changes the track line and loads...

  • How Do You Match Carrier Roller Size and Mounting?

    Match a carrier roller by its diameter, width, shaft, flange style, and mounting bracket, then confirm the part number against the machine serial number. Carrier rollers look similar across models,...

  • How Do You Replace a Carrier Roller?

    Replace a carrier roller by securing the machine, removing the track and accessing the top roller, unbolting and lifting the old unit, fitting and torquing the new one, then re-tensioning...